MATERIAL                 COST                     QUANTITY            TOTAL

70ft handwoven wire   55cedis                 37 rolls                2035 cedis

Metal poles                   15 cedis                 260pieces           3900cedis

Transportation        100cedis                                                       100  ”

Cement                         31 cedis                     10 bags                 310

Gravel                          200                            1 trip                      200

Water                         200                                                            200

Labour                       300                                                            300

Without the gate, the grand total is 7045. The gate is estimated at 2000…